AY/AZ Tank Farm Infrastructure Upgrades  

Hanford Area

The AY/AZ Infrastructure Upgrades project consisted of the installation of 90’ of waterline and a 120’ long retaining wall as part of facility upgrades needed to prepare AY/AZ tank farms for its future mission to deliver waste to the Waste Treatment Plant (WTP).  Electrical modifications were also performed including the pouring of a concrete pad and placement of a 5,000KVA transformer.  The project was successfully performed in a radiological controlled environment with no safety incidents.

Client: Washington River Protection Solutions