Building 251 Dispatch

Hanford Area

The remodel of the 251 Electrical Dispatch center occurred while keeping the entire building in service during construction.   Approximately 45% of the project included a complete electrical upgrade including new energy efficient lighting, two service transformers, the replacement of the backup diesel generator with a new propane generator, new Automatic Transfer switches, and the removal of outdated UPS units.  Additional work scope included the installation of a permanent water trailer to replace the building’s unsanitary potable water lines, a new kitchen, bathroom, removal and installation of new flooring throughout building to replace the existing asbestos tile, an entirely new HVAC system, acoustical ceiling, new asphalt parking lot, ¼ mile asphalt overlay, and painting of the exterior and interior of the building.

Client: Mission Support Alliance